Talk:Stanbury Village Barricade Plan

From The Urban Dead Wiki
Jump to navigationJump to search

This page is for discussing the Stanbury Village Barricade plan. Please address any gripes, complaints, issues, or suggestions here.

Discussion

The plan needs to be updated, Forse Walk School [58,56] is being used as an EP as it is extremely effective in reducing the AP Between revives. - Pardus 20:22, 19 September 2007 (BST)

Done. Come to think of it, the only reason it wasn't already an entry point is because the barricade plan was written before Yeoman Park became a revive point. --Uncle Bill 07:06, 21 September 2007 (BST)

-

  • I wanted to bring Stanbury Village in compliance with the Uniform Barricade Plan. Previously, the vast majority of the suburb was set to EHB, but in practice only a small portion of the suburb's barricades are maintained anywhere near that level. Most of this BP is up for discussion, so if you feel a certain building should be barricaded differently then please speak up. --Uncle Bill 05:57, 7 December 2006 (UTC)
  • Daynes Alley Police Dept and St Maria's Church are overbarricaded. St Augustine's Church was VSB, as indicated by the plan. --Sexy Rexy Grossman 13:25, 16 January 2007 (UTC)
  • I'll try to address that issue with people in the area. Also, please not the status change for Moseley NT. --Uncle Bill 14:52, 20 January 2007 (UTC)
  • Requesting we change the cade levels of catherine to EHB. Rotter's Relief has been using it for as a safehouse when it's not ruined and keeping it at VSB isn't practical. Moseley is uncaded the vast majority of the time and can be used as an entry point. R.R. members suggest using the junkyard as an entry point --UCSBrandon 21:15, 25 January 2009 (UTC)

-

Hey Uncle Bill, is that rotter's relief thing at Mosely closed now? What's up over there since it's back to EHB? --Benigno SSZ RCC 04:10, 7 May 2007 (BST)

They're still around but don't have the numbers to run the brain rot clinic right now. Plus, they haven't been getting a lot of rotters seeking revives lately. I changed the BP at their request, and I'll change it back when they're ready to re-open. --Uncle Bill 04:36, 7 May 2007 (BST)
Cool, thanks for letting me know and for keeping up with them. --Benigno SSZ RCC 04:48, 7 May 2007 (BST)

-catherine general hospt. is over run has 5 zombies there. if people still use this then good cuz it works.-masterninja11 4/18/10

  • Low survivor numbers in the area as well as apparent past abuse of RR means that Moseley should be EHB at all times. I won't change the wiki page until confirmed but RR seems to be over. --RegentZero 23:27, 30 December 2013 (UTC)
  • I would like to suggest that the Betty Building (59,57) or the Batson museum (57,55) be used for the EP over Forse Walk School (58,56) and move Forse to EHB. Forse is key in the freerunning lane to Went NT (59.55) from the S or W. Either Batson or Betty would give us the free running lanes more secured and make for 1AP at more more to get inside from the RP. --Checkered (talk) 23:05, 14 December 2016 (UTC)
Would this change keep the plan UBP-compliant? UBP-compliant plans are harder to change. Bob Moncrief EBDW! 22:03, 15 December 2016 (UTC)
I do believe this would still keep the plan UBP-compliant. Both options are adjacent to the current entry point and within the SE quadrant of the burb. The more I look at it, the more I think that Batson would be the better option. In my mind, even making both EPs would be better than having Forse continue to be one, for the sake of the free running lane, as there are lanes that can get around either Batson or Betty getting ruined, but not Forse. May not make the biggest difference, but just thinking a single point of failure on a free running lane to an NT should be ehb. Could be just overthinking things. --Checkered (talk) 02:06, 16 December 2016 (UTC)
OK, I'll endorse. You should wait a few days in case anybody else comments. But if nobody does, feel free to make the change later this week. Bob Moncrief EBDW! 12:25, 16 December 2016 (UTC)