Dentonside Power/Allocated Work Places: Difference between revisions
From The Urban Dead Wiki
Jump to navigationJump to search
No edit summary |
|||
Line 5: | Line 5: | ||
== '''Current Operations''' == | == '''Current Operations''' == | ||
Okay, the current operations within the suburb are as follows. | |||
*'''Rapid Cleansing & Maintenance''' | |||
This basically involves [[Barricade Strafing]] within the suburb while adhering to the set [[Dentonside#Dentonside_Barricade_Plan|Barricade Plan]] of Dentonside. Hopefully this will allow the suburb to return to a state of relative safety. Although failing this the second plan is to defend [[Tactical Resource Point|critical points]] within the suburb and expand from there. | |||
'''Other than that there currently are no other set operations!''' | |||
[[Category:Dentonside Power]] | [[Category:Dentonside Power]] |
Revision as of 01:24, 5 January 2010
Current OperationsOkay, the current operations within the suburb are as follows.
This basically involves Barricade Strafing within the suburb while adhering to the set Barricade Plan of Dentonside. Hopefully this will allow the suburb to return to a state of relative safety. Although failing this the second plan is to defend critical points within the suburb and expand from there.
|