Krinks Power Station: Difference between revisions

From The Urban Dead Wiki
Jump to navigationJump to search
Line 40: Line 40:


=== Current Status ===
=== Current Status ===
'''Late December 2009''' All 4 quadrants totally ruined. The destruction was preceded by  series of [[GK]] incidents in the plant. There are no surviving members of the [[WWSIS]], except for one who was getting supplies from the mall at the time of the invasion.  --[[User:Zyckde|Zyckde]], 28 December 2009 (BST)
'''Late December 2009''' 2 Eastern quadrants totally ruined. The destruction was preceded by  series of [[GK]] incidents in the Western side of the plant. There are no surviving members of the [[WWSIS]], except for one who was getting supplies from the mall at the time of the invasion and is currently the last survivor in there.  --[[User:Zyckde|Zyckde]], 28 December 2009 (BST)


'''December 2009''' All 4 quadrants fully powered,  NE and SE with transmitters tuned at 27.18 Mhz. Most survivors stay in the surrounding buildings. All sections EHB. The generators are being refueled constantly by members of the [[WWSIS]].  --[[User:Zyckde|Zyckde]], 18 December 2009 (BST)
'''December 2009''' All 4 quadrants fully powered,  NE and SE with transmitters tuned at 27.18 Mhz. Most survivors stay in the surrounding buildings. All sections EHB. The generators are being refueled constantly by members of the [[WWSIS]].  --[[User:Zyckde|Zyckde]], 18 December 2009 (BST)

Revision as of 09:36, 28 December 2009

Mall-safe-small.jpg

[36,92] - [37,93] (bic) (statuses) (update)
Krinks Power Station
EHB, SW corner - VHB, powered
hajen (talk) 20:15, 26 March 2024 (UTC)


Krinks Power Station

Williamsville [36,92], [37,92], [36,93], [37,93]

Milne Row Voke Auto Repair the Bugden Building Shartman Walk
Mooney Street Krinks Power Station Krinks Power Station Woodhouse Grove
the Clayton Building Krinks Power Station Krinks Power Station Condon Boulevard Fire Station
Trask Place a carpark the Reddrop Monument the Bullor Arms

Basic Info:

  • Power Stations do not power other locations.
  • Tagging Power Stations earns 1 XP with the Tagging skill.
  • There are two power stations in the city: Krinks (2x2 block square) and Tolman (two blocks).
Mar19 6311.jpg


Krinks Power Station before the outbreak


Description

Krinks Power Station is a four-block building located in the suburb of Williamsville in the south of the city and is one of the two defunct power stations in Malton. It was originally owned and operated by Malton Power and Light prior to the outbreak, but these days is often abandoned, despite its ideal location as a Base Of Operations. It used to be inhabited by the Communist Party of Malton and Zombie Juice, two survivor groups. As of November 2009, Krinks Power Station is inhabited by people not belonging to any group, often passing through. For now the WWSIS maintains the station. They adhere to the safety standards as set by the Communist Party of Malton for this location.


Powerstation.jpg


A photo of one of the turbine halls

Current Status

Late December 2009 2 Eastern quadrants totally ruined. The destruction was preceded by series of GK incidents in the Western side of the plant. There are no surviving members of the WWSIS, except for one who was getting supplies from the mall at the time of the invasion and is currently the last survivor in there. --Zyckde, 28 December 2009 (BST)

December 2009 All 4 quadrants fully powered, NE and SE with transmitters tuned at 27.18 Mhz. Most survivors stay in the surrounding buildings. All sections EHB. The generators are being refueled constantly by members of the WWSIS. --Zyckde, 18 December 2009 (BST)

November 2009 All 4 quadrants fully powered, NE and SE with transmitters tuned at 28.37 Mhz. Total of 4 survivors. All sections EHB. --RoyKirk 21:45, 6 November 2009 (BST)

September 2009 The building has been ruined and all of the doors have been secured, there are a few zombie's gathering around. --user:Alixandah 16 September 2009 (BST)

May 2009 All 4 quadrants fully powered, 2 with transmitters. Total of 14 survivors (including me). All sections EHB. --James Woodgrow 09:58, 29 May 2009 (BST)

Radio

Radiotransmission.gif Short-wave Radio Info
Krinks Power Station

Frequency: 27.18 MHz
Channel: LURCS
Transmitter coordinates: Currently North Western Block

Wwsissmallblue.jpg Labour Union Radio Channel Service
Freq.: 27.18 MHz

Barricade Policy

Barricade to EHB (Williamsville Barricade Plan)

History

Krinks Power Station/Archive

  • Don't be a nobody - Sign your posts! Just use --~~~~ or this button Sign.png in the editor.

Safety Standards from the Communist Party of Malton

  • Try to keep this Power Station powered at all times.
  • Keep this Power Station zombie-free. They're nothing but trouble.
  • Repair damage when possible.
  • Nobody is low priority. We're all equal.