Krinks Power Station

From The Urban Dead Wiki
Revision as of 12:41, 18 December 2009 by Zyckde (talk | contribs) (→‎Radio)
Jump to navigationJump to search

Mall-safe-small.jpg

[36,92] - [37,93] (bic) (statuses) (update)
Krinks Power Station
--VVV RPMBG 20:31, 14 July 2024 (UTC)


Krinks Power Station

Williamsville [36,92], [37,92], [36,93], [37,93]

Milne Row Voke Auto Repair the Bugden Building Shartman Walk
Mooney Street Krinks Power Station Krinks Power Station Woodhouse Grove
the Clayton Building Krinks Power Station Krinks Power Station Condon Boulevard Fire Station
Trask Place a carpark the Reddrop Monument the Bullor Arms

Basic Info:

  • Power Stations do not power other locations.
  • Tagging Power Stations earns 1 XP with the Tagging skill.
  • There are two power stations in the city: Krinks (2x2 block square) and Tolman (two blocks).
Mar19 6311.jpg


An exterior picture of Krinks


Description

Krinks Power Station is a four-block building located in the suburb of Williamsville in the south of the city and is one of the two defunct power stations in Malton. It was originally owned and operated by Malton Power and Light prior to the outbreak, but these days is often abandoned, despite its ideal location as a Base Of Operations. It used to be inhabited by the Communist Party of Malton and Zombie Juice, two survivor groups. As of November 2009, Krinks Power Station is inhabited by people not belonging to any group, often passing through. For now the WWSIS maintains the station. They adhere to the safety standards as set by the Communist Party of Malton for this location.

Current Status

December 2009 All 4 quadrants fully powered, NE and SE with transmitters tuned at 27.18 Mhz. Most survivors stay in the surrounding buildings. All sections EHB. The generators are being refueled constantly by members of the WWSIS. --Zyckde, 18 December 2009 (BST)

November 2009 All 4 quadrants fully powered, NE and SE with transmitters tuned at 28.37 Mhz. Total of 4 survivors. All sections EHB. --RoyKirk 21:45, 6 November 2009 (BST)

September 2009 The building has been ruined and all of the doors have been secured, there are a few zombie's gathering around. --user:Alixandah 16 September 2009 (BST)

May 2009 All 4 quadrants fully powered, 2 with transmitters. Total of 14 survivors (including me). All sections EHB. --James Woodgrow 09:58, 29 May 2009 (BST)

Radio

Radiotransmission.gif Short-wave Radio Info
Krinks Power Station

Frequency: 27.18 MHz
Channel: LURCS
Transmitter coordinates: Currently North Western Block

Wwsissmallblue.jpg Labour Union Radio Channel Service
WWSIS Freq.: 27.18 MHz

Transmitter coordinates: Unavailable


Powerstation.jpg


A photo of one of the turbine halls

Barricade Policy

Barricade to EHB (Williamsville Barricade Plan)

History

Krinks Power Station/Archive

  • Don't be a nobody - Sign your posts! Just use --~~~~ or this button Sign.png in the editor.

Safety Standards from the Communist Party of Malton

  • Try to keep this Power Station powered at all times.
  • Keep this Power Station zombie-free. They're nothing but trouble.
  • Repair damage when possible.
  • Nobody is low priority. We're all equal.