Gatcombeton Barricade Plan: Difference between revisions
The Rooster (talk | contribs) No edit summary |
m (→About) |
||
Line 8: | Line 8: | ||
==About== | ==About== | ||
This Barricade Plan has been prepared by the | This Barricade Plan has been prepared by the group [[Organization XIII]]. |
Latest revision as of 11:05, 26 November 2012
TinyURL to here: http://tinyurl.com/3xpxcm
This is the Barricade Plan for the suburb of Gatcombeton.
This diagram shows what levels buildings should ideally be barricaded to in order to provide protection in the form of Extremely Heavily Barricaded buildings, whilst designating entry points in the form of Very Strongly Barricaded buildings. Please note this plan indicates the preferred levels of barricades, and not the current levels.
If you wish to discuss alterations to this plan, please use the talk page.
If you need to edit the barricade plan, go to Template:Gatcombeton Barricade Plan. If changes are made, please be sure to also edit the Barricade Policy section of the page for any buildings affected.
To include the barricade plan on a page use:
{{Gatcombeton Barricade Plan}} for a fullsize plan
or
{{Gatcombeton Barricade Plan|Small}} for a smaller version.
UBP Non-Compliant Barricade Plan | |
This barricade plan is not compliant with the Uniform Barricading Policy. This plan was last reviewed on October 11, 2009. |
LEGEND | ||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ||||||||||||||||||||||
| ||||||||||||||||||||||
|
About
This Barricade Plan has been prepared by the group Organization XIII.